“Lukoil Neftochim Burgas” is the largest refinery on the Balkan Peninsula. It is a major supplier of liquid fuels, petrochemicals and polymers in Bulgaria and one of the leading manufacturers and suppliers of these products not only on the Balkan Peninsula but also in Europe. The refinery operates in line with leading world standards in the field of petroleum processing and ecology.
In February 2006, ProStream Group participated in the tender for the Local Clearing Station of Rosenets Oil Terminal, announced by Lukoil Neftochim Bourgas AD. The facility we proposed was produced by the leading European producer of water treatment plants – Nijhuis Water Technology, the Netherlands. Despite strong domestic and international competition, our offer was ranked first.
According to the signed in June 2006, contract, ProStream Group commits itself to the necessary work design, author’s supervision, execution, supply of equipment and spare parts, boss-assembling, settings, 72-hour tests and refinery press training. Taking into consideration the parameters of the incoming flow, in compliance with the tender conditions and thanks to the selected technological scheme, ProStream Group is committed to guarantee the outflow indicators – purified water, according to the stated values.
Input metrics:
Indicator | Dimension | Quantities and contamination of industrial flow | Amounts and pollution of the household-faecal flow |
average daily amount | м3/day | 168 (dry) / 264 (rain) | 17 (dry) / 24 (rain) |
average hourly amount | м3/day | 7 (dry) / 11 (rain) | 0,7 (dry) / 1 (rain) |
chemical oxygen demand (COD) | mg/l | 250 – 1.000 | |
Biological consumption of oxygen5 | mg/l | 40 – 400 | 60 – 160 |
Unsolved substances, total | mg/l | 30 – 300 | 30 – 300 |
ammonium nitrogen | mg/l | to 5 | 15 – 36 |
phosphorus total | mg/l | под 0.5 | 10 – 15 |
Petroleum products | mg/l | 50 – 200; max. 2.000 | |
PH | 5,5 – 9,0 |
Warranty indicators:
Warranty indicator | Dimension | Output Flow Value |
chemical oxygen demand (COD) | mg/l | < / = 125 |
Biological consumption of oxygen5 | mg/l | < / = 25 |
Unsolved substances, total | mg/l | < / = 30 |
total nitrogen (by Kjeldahl) | mg/l | < / = 10 |
Фосфор общо | mg/l | < / = 2 |
Нефтопродукти | mg/l | < / = 3 |
рН | mg/l | 5,5 – 9 |
“Lukoil Neftochim Burgas” is the largest refinery on the Balkan Peninsula. It is a major supplier of liquid fuels, petrochemicals and polymers in Bulgaria and one of the leading manufacturers and suppliers of these products not only on the Balkan Peninsula but also in Europe. The refinery operates in line with leading world standards in the field of petroleum processing and ecology.
In February 2006, ProStream Group participated in the tender for the Local Clearing Station of Rosenets Oil Terminal, announced by Lukoil Neftochim Bourgas AD. The facility we proposed was produced by the leading European producer of water treatment plants – Nijhuis Water Technology, the Netherlands. Despite strong domestic and international competition, our offer was ranked first.
According to the signed in June 2006, contract, ProStream Group commits itself to the necessary work design, author’s supervision, execution, supply of equipment and spare parts, boss-assembling, settings, 72-hour tests and refinery press training. Taking into consideration the parameters of the incoming flow, in compliance with the tender conditions and thanks to the selected technological scheme, ProStream Group is committed to guarantee the outflow indicators – purified water, according to the stated values.
Input metrics:
Indicator | Dimension | Quantities and contamination of industrial flow | Amounts and pollution of the household-faecal flow |
average daily amount | м3/day | 168 (dry) / 264 (rain) | 17 (dry) / 24 (rain) |
average hourly amount | м3/day | 7 (dry) / 11 (rain) | 0,7 (dry) / 1 (rain) |
chemical oxygen demand (COD) | mg/l | 250 – 1.000 | |
Biological consumption of oxygen5 | mg/l | 40 – 400 | 60 – 160 |
Unsolved substances, total | mg/l | 30 – 300 | 30 – 300 |
ammonium nitrogen | mg/l | to 5 | 15 – 36 |
phosphorus total | mg/l | под 0.5 | 10 – 15 |
Petroleum products | mg/l | 50 – 200; max. 2.000 | |
PH | 5,5 – 9,0 |
Warranty indicators:
Warranty indicator | Dimension | Output Flow Value |
chemical oxygen demand (COD) | mg/l | < / = 125 |
Biological consumption of oxygen5 | mg/l | < / = 25 |
Unsolved substances, total | mg/l | < / = 30 |
total nitrogen (by Kjeldahl) | mg/l | < / = 10 |
Фосфор общо | mg/l | < / = 2 |
Нефтопродукти | mg/l | < / = 3 |
рН | mg/l | 5,5 – 9 |
“Lukoil Neftochim Burgas” is the largest refinery on the Balkan Peninsula. It is a major supplier of liquid fuels, petrochemicals and polymers in Bulgaria and one of the leading manufacturers and suppliers of these products not only on the Balkan Peninsula but also in Europe. The refinery operates in line with leading world standards in the field of petroleum processing and ecology.
In February 2006, ProStream Group participated in the tender for the Local Clearing Station of Rosenets Oil Terminal, announced by Lukoil Neftochim Bourgas AD. The facility we proposed was produced by the leading European producer of water treatment plants – Nijhuis Water Technology, the Netherlands. Despite strong domestic and international competition, our offer was ranked first.
According to the signed in June 2006, contract, ProStream Group commits itself to the necessary work design, author’s supervision, execution, supply of equipment and spare parts, boss-assembling, settings, 72-hour tests and refinery press training. Taking into consideration the parameters of the incoming flow, in compliance with the tender conditions and thanks to the selected technological scheme, ProStream Group is committed to guarantee the outflow indicators – purified water, according to the stated values.
Input metrics:
Indicator | Dimension | Quantities and contamination of industrial flow | Amounts and pollution of the household-faecal flow |
average daily amount | м3/day | 168 (dry) / 264 (rain) | 17 (dry) / 24 (rain) |
average hourly amount | м3/day | 7 (dry) / 11 (rain) | 0,7 (dry) / 1 (rain) |
chemical oxygen demand (COD) | mg/l | 250 – 1.000 | |
Biological consumption of oxygen5 | mg/l | 40 – 400 | 60 – 160 |
Unsolved substances, total | mg/l | 30 – 300 | 30 – 300 |
ammonium nitrogen | mg/l | to 5 | 15 – 36 |
phosphorus total | mg/l | под 0.5 | 10 – 15 |
Petroleum products | mg/l | 50 – 200; max. 2.000 | |
PH | 5,5 – 9,0 |
Warranty indicators:
Warranty indicator | Dimension | Output Flow Value |
chemical oxygen demand (COD) | mg/l | < / = 125 |
Biological consumption of oxygen5 | mg/l | < / = 25 |
Unsolved substances, total | mg/l | < / = 30 |
total nitrogen (by Kjeldahl) | mg/l | < / = 10 |
Фосфор общо | mg/l | < / = 2 |
Нефтопродукти | mg/l | < / = 3 |
рН | mg/l | 5,5 – 9 |